PRWFPA logo
 
aerial
canal
tractor
   
Documents Available for Download

Pajaro River Watershed Study – Phase 1 (July 2002)

Pajaro River Watershed Study – Phase 2 (April 2003)

Pajaro River Watershed Study – Phase 3 and 4a (February 2005)

Pajaro River Watershed Study – Phase 4b (June 2005)

          • Pajaro River Watershed Integrated Regional Water Management Plan
            (IRWMP) 2007
 

• Soap Lake Floodplain Preservation Project
     DRAFT IS/ND (September 2004)
     FINAL IS/ND (March 2005)

Summary Presentation of Sediment Modeling (June 2005)

Proposition 50, Chapter 8 Grant Application (July 2005)
Pajaro River Watershed Integrated Regional Water Management Plan
  (IRWMP) Work Plan (May 2005)
All documents prepared by:
RMC logo

 

Home | Board of Directors | Pajaro River Watershed Study | Document Downloads
Public Meetings
| Contact Us